Inspection Type |
Planned
|
Scope |
Complete
|
Safety/Health |
Health
|
Close Conference |
2013-02-07
|
Emphasis |
P: FISH, L: FISH
|
Case Closed |
2013-04-05
|
Related Activity
Type |
Inspection |
Activity Nr |
887564 |
Safety |
Yes |
|
Violation Items
Citation ID |
01001 |
Citaton Type |
Other |
Standard Cited |
19101030 F01 II B |
Issuance Date |
2013-03-12 |
Abatement Due Date |
2013-04-12 |
Current Penalty |
306.0 |
Initial Penalty |
306.0 |
Final Order |
2013-04-08 |
Nr Instances |
1 |
Nr Exposed |
1 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1910.1030(f)(1)(ii)(B): The employer did not ensure that all medical evaluations and procedures including the hepatitis B vaccine and vaccination series, post-exposure evaluation, or follow-up, including prophylaxis, were made available to the employee at a reasonable time and place: U.S. Liberator: On or about February 7, 2013 and at times prior thereto, the hepatitis B vaccinination series had not been completed. This condition exposed the employee to bloodborne patohgen hazards including hepatitis B from exposure to blood and other potentially infectious material. |
|
|
Inspection Type |
Planned
|
Scope |
Complete
|
Safety/Health |
Safety
|
Close Conference |
2013-02-07
|
Emphasis |
L: FISH, P: FISH
|
Case Closed |
2013-04-05
|
Related Activity
Type |
Inspection |
Activity Nr |
887483 |
Health |
Yes |
|
Violation Items
Citation ID |
01001A |
Citaton Type |
Serious |
Standard Cited |
19150089 C01 |
Issuance Date |
2013-03-12 |
Abatement Due Date |
2013-04-12 |
Current Penalty |
1285.2 |
Initial Penalty |
1836.0 |
Final Order |
2013-04-03 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1915.89(c)(1): The employer did not ensure that, before any authorized employee performs servicing when energization or startup, or the release of hazardous energy, may occur, all energy sources are identified and isolated, and the machinery, equipment, or system was rendered inoperative. Coastal dock, F/V U.S. Liberator, Factory: On or about 7 February 2013 and times prior thereto, a Tokai Header, Model PHC-550, machine number 159, 208V, 3PH; maintenance was being performed on the unit and it was not locked or tagged out. This condition exposed employees to a caught-in and amputation hazard. |
|
Citation ID |
01001B |
Citaton Type |
Serious |
Standard Cited |
19150089 C07 IV |
Issuance Date |
2013-03-12 |
Abatement Due Date |
2013-04-12 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2013-04-03 |
Nr Instances |
1 |
Nr Exposed |
2 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1915.89(c)(7)(iv): The employer did not ensure the lockout/tags-plus coordinator maintained and administered a continuous log of each lockout and tags-plus system. Coastal Dock, F/V U.S. Liberator, Factory; on or about 7 February 2013 and times prior thereto, a Tokai Header, Model PHC-550, machine number 159 208V, 3PH; maintenance was being performed on the unit and it was not locked or tagged out. The lockout/tags plus coordinator did not maintain a continuous log of the lock/out tags-plus system. This condition exposed employees to a caught-in hazard. |
|
Citation ID |
01001C |
Citaton Type |
Serious |
Standard Cited |
19150089 D01 |
Issuance Date |
2013-03-12 |
Abatement Due Date |
2013-04-12 |
Current Penalty |
0.0 |
Initial Penalty |
0.0 |
Final Order |
2013-04-03 |
Nr Instances |
1 |
Nr Exposed |
3 |
Gravity |
5 |
FTA Current Penalty |
0.0 |
Citation text line |
29 CFR 1915.89(d)(1): The employers did not include a clear and specific outline of the scope and purpose for each lockout/tags-plus procedure. Coastal Dock, F/V U.S. Liberator, Factory area; on or about 7 February 2013 and times prior thereto, a Tokai Header, Model PHC-550, 208V, 3PH electrical, maintenance was being performed on the unit and it was not locked or tagged out. No specific written procedures were available to prevent energization or release of hazardous energy.This condition exposed employees to a caught-in hazard. |
|
|