Directions to Mine |
formerly Gilmore Trail to end of pavement. Left on trail to Smallwood Creek. 3550 parks hwy.
|
Parties
Name
|
Fairbanks Excavation, LLC
|
Role
|
Operator
|
Start Date
|
2012-06-27
|
|
Name
|
Joseph A Young
|
Role
|
Current Controller
|
Start Date
|
2012-06-27
|
|
Name
|
Fairbanks Excavation, LLC
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2023-07-27
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Absorption of radiations, caustics, toxic and noxious substances
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Bee hive inside trailer frame. While loading tires on trailer, demonic bees malevolently stung the miner causing an allergic reaction and the miners immediate administration of EE's prescribed auto-injection EpiPen dose for anaphylaxis and immediate transport for medical care.
|
|
Accident Date |
2021-06-17
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Previous shift evacuated mine early due to intense thunderstorm leaving mobile equipment parked hazardously. 1-30 769D truck parked on a slight-grade was started with parking brake off, no chocks and when air pressure released the brakes it rolled forward into 1-23 D400E crushing victim between bumpers.
|
|
Accident Date |
2018-10-14
|
Degree Inhury |
INJURIES DUE TO NATURAL CAUSES
|
Accident Type |
Unclassified, insufficient data
|
Ocupation |
Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver
|
Narrative |
Unknown cause of death, victim was found inside personal moterhome parked in employee camping area. Suspected drug overdose: Heroin and marijuana found inside motorhome.
|
|
Accident Date |
2015-05-13
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Was changing drill steel and it swung in his path & struck him in chest area bruising his chest (bruising only)
|
|
Inspections
Start Date |
2023-12-15
|
End Date |
2023-12-15
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2023-04-23
|
End Date |
2023-04-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23.25
|
|
Start Date |
2022-10-05
|
End Date |
2022-10-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2022-04-28
|
End Date |
2022-04-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18.5
|
|
Start Date |
2022-02-28
|
End Date |
2022-02-28
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
11.25
|
|
Start Date |
2021-11-01
|
End Date |
2022-03-26
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
6.25
|
|
Start Date |
2021-10-06
|
End Date |
2021-10-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
42.25
|
|
Start Date |
2021-06-21
|
End Date |
2021-06-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
36
|
|
Start Date |
2021-06-17
|
End Date |
2021-10-10
|
Activity |
Non-Fatal Accident Investigation
|
Number Inspectors |
1
|
Total Hours |
75
|
|
Start Date |
2021-05-26
|
End Date |
2021-05-26
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2021-04-19
|
End Date |
2021-04-20
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
13
|
|
Start Date |
2021-03-14
|
End Date |
2021-03-17
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
37.5
|
|
Start Date |
2020-10-07
|
End Date |
2020-10-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2020-03-26
|
End Date |
2020-03-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Start Date |
2018-10-14
|
End Date |
2018-10-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.5
|
|
Start Date |
2018-10-14
|
End Date |
2018-10-16
|
Activity |
Non-Chargeable Accident Investigation
|
Number Inspectors |
1
|
Total Hours |
38.5
|
|
Start Date |
2018-06-02
|
End Date |
2018-06-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2017-09-15
|
End Date |
2017-09-16
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2017-05-16
|
End Date |
2017-05-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
37.5
|
|
Start Date |
2016-10-25
|
End Date |
2016-10-25
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
4.25
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
3346
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1673
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
9218
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1536
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
27406
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2741
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
21050
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
2339
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
21885
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2736
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
20886
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
2089
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
19972
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1997
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
14842
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1484
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
11678
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1668
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
17242
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
1437
|
|
|