Search icon

Bering Industrial Contractors, Inc.

Contents

Company Details

Name: Bering Industrial Contractors, Inc.
Jurisdiction: Alaska
Legal type: Business Corporation
Status: Good Standing
Date of registration: 07 Aug 2007 (17 years ago)
Entity Number: 110466
Place of Formation: WASHINGTON
Address: 23124 100TH AVE W, PO BOX 628, EDMONDS, WA 98020
Mailing Address: PO BOX 628, EDMONDS, WA 98020

Activity

Line of Business

23 Construction

NAICS

238220 PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS

Officers

Name Role
Foster Kanon Director
Foster Kanon Vice President
John Marker Shareholder
John Marker Director
John Marker Secretary
John Marker President
C T Corporation System Registered Agent

Business Licenses

License Number Type Status Issue Date Date of renewal Expiration date Description
906050 Business License Active 2007-08-07 2024-12-17 2026-12-31 LOB: 23 - Construction, NAICS: 238220 - PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS

Professional Licenses

License Number Program Type Status Issue Date Effective Date Expiration Date
CONM33259 Construction Contractors General Contractor Without Residential Contractor Endorsement Active 2007-08-07 2024-11-01 2026-09-30

OSHA's Inspections within Industry

Inspection Nr Report ID Date Opened Site Address
346021280 1032100 2022-06-15 BUILDING N91, KODIAK, AK, 99615
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2022-06-15
Case Closed 2022-10-21
344993993 1032100 2020-10-20 U.S. COAST GUARD BASE SOQ-D PARKS DRIVE, KODIAK, AK, 99615
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2021-02-25
Emphasis N: CTARGET, P: CTARGET
Case Closed 2021-04-08

Related Activity

Type Inspection
Activity Nr 1499404
Safety Yes
Type Inspection
Activity Nr 1499396
Safety Yes

Violation Items

Citation ID 01001A
Citaton Type Serious
Standard Cited 19260034 A
Issuance Date 2021-02-26
Abatement Due Date 2021-03-10
Current Penalty 4770.0
Initial Penalty 9557.0
Final Order 2021-03-26
Nr Instances 1
Nr Exposed 5
Gravity 10
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.34(a):Building or structure exits were not so arranged and maintained as to provide free and unobstructed egress from all parts of the building or structure at all times when it was occupied: a) SOQ-D, Building 123 - On or about October 20, 2020, employees performed construction activities to include but not limited to plumbing, but the exit was not arranged to provide free and unobstructed egress with the building occupied, exposing employees to fire hazards.
Citation ID 01001B
Citaton Type Serious
Standard Cited 19260034 B
Issuance Date 2021-02-26
Abatement Due Date 2021-03-10
Current Penalty 0.0
Initial Penalty 0.0
Final Order 2021-03-26
Nr Instances 1
Nr Exposed 7
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.34(b): Exits and access to exits were not marked by a readily visible sign: a) SOQ-D, Building 123 - On or about October 20, 2020, employees performed construction activities to include but not limited to plumbing, but the exit was not marked by a readily visible sign.
344993233 1032100 2020-10-20 U.S. COAST GUARD BASE TANK FARM, KODIAK, AK, 99615
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2020-10-29
Emphasis L: FEDCONST, P: FEDCONST
Case Closed 2020-10-29

Related Activity

Type Inspection
Activity Nr 1499328
Safety Yes
Type Inspection
Activity Nr 1499325
Safety Yes
344993118 1032100 2020-10-19 U.S. COAST GUARD BASE FUEL PIER, KODIAK, AK, 99615
Inspection Type Referral
Scope Partial
Safety/Health Safety
Close Conference 2021-01-13
Emphasis N: AMPUTATE
Case Closed 2021-02-26

Related Activity

Type Inspection
Activity Nr 1499305
Safety Yes
Type Referral
Activity Nr 1650064
Safety Yes

Violation Items

Citation ID 01001
Citaton Type Serious
Standard Cited 19260602 C01 II
Issuance Date 2021-02-05
Abatement Due Date 2021-03-04
Current Penalty 2528.0
Initial Penalty 4213.0
Final Order 2021-02-23
Nr Instances 1
Nr Exposed 6
Gravity 5
FTA Current Penalty 0.0
Citation text line 29 CFR 1926.602(c)(1)(ii): Modifications or additions affecting the safe operation of the equipment were made without the manufacturer's written approval. a) Fuel Pier, Building 521 - On or about August 24, 2020, employees operated powered industrial trucks to lift and move 125 feet section of fuel pipe, attaching a nylon choker to the forklift tines which was an addition affecting the safe operation of the equipment and were made without the manufacturer's written approval, exposing employees to struck-by hazards.
307503524 1032100 2008-06-10 USCG FUEL PIER PROJECT, KODIAK, AK, 99619
Inspection Type Planned
Scope Complete
Safety/Health Safety
Close Conference 2008-06-10
Emphasis S: FALL FROM HEIGHT, L: FEDCONST, S: ELECTRICAL
Case Closed 2008-07-03

Violation Items

Citation ID 01001
Citaton Type Other
Standard Cited 19101200 E01
Issuance Date 2008-06-27
Abatement Due Date 2008-07-31
Nr Instances 1
Nr Exposed 1
Gravity 01

Date of last update: 24 Jan 2025

Sources: State of Alaska - Department of Commerce, Community, and Economic Development