#7-100 Portable
|
Surface
|
Intermittent
|
Construction Sand and Gravel
|
|
Directions to Mine |
Mobile - various locations.
|
Parties
Name
|
QAP
|
Role
|
Operator
|
Start Date
|
2000-09-01
|
|
Name
|
Alaska Aggregate Corp
|
Role
|
Operator
|
Start Date
|
1950-01-01
|
End Date
|
1993-06-14
|
|
Name
|
Aggregate Products Inc
|
Role
|
Operator
|
Start Date
|
1993-06-15
|
End Date
|
2000-08-31
|
|
Name
|
Colas S A
|
Role
|
Current Controller
|
Start Date
|
2000-09-01
|
|
Name
|
QAP
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2022-07-27
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee was removing a threaded bolt with impact gun and got thumb caught between top plate and gun.
|
|
Accident Date |
2019-06-13
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by falling object
|
Ocupation |
Welder (shop)
|
Narrative |
Employee was attempting / working to repair a section of the gear box, when a 10# piece of iron broke free and fell approximately 12'' and landed on top of arch of foot resulting in piercing top of boot creating puncture wound.
|
|
Accident Date |
2016-05-27
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Welder (non-shop)
|
Narrative |
After working all day cutting, welding and grinding the miner thought they got something stuck in their eye. Next day EE went to the ER and had item removed on follow up appointment EE was prescribed Antibiotic and Steroid Salve.
|
|
Accident Date |
2005-07-07
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Greaser, Grease man, Oiler, Lube man, Dragline oiler
|
Narrative |
Over several days of material handling (rain soaked aggregate and equipment) employee sufferred mild lumbar muscle strain requiring chiropractic treatment and modified duty work for several days.
|
|
Accident Date |
2005-06-03
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion in pulling or pushing objects
|
Ocupation |
Outside foreman, Leadman
|
Narrative |
Employee manually handling and positioning portable metal stairs; stair's approximate weight 75 lbs. During task employee sufferred lumbar strain.
|
|
Accident Date |
2004-08-19
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck against stationary object
|
Ocupation |
Crane operator, Mobile equipment operator (MEO), Dragline operator, Dropball operator, Rigger
|
Narrative |
Employee assisting in the installation of new sizing screen in screening trailer. As employee slid screen into place the sharp front edge of the screen caught and lacerated his left, middle finger. Laceration required medical treatment and application of several butterfly closures.
|
|
Accident Date |
2004-08-11
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee assisting in positioning 40-foot long structural conveyor sections on flat bed semi-trailer when calve pinched between two conveyor sections.
|
|
Accident Date |
2004-07-28
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck against stationary object
|
Ocupation |
Pumper
|
Narrative |
Employee egressing from water truck's tank using fabricated structural steel ladder. As employee was stepped down final steps and attempting to step away from truck's tank a ring on employee's left ring finger caught on a projection on one of the water truck's valve.
|
|
Accident Date |
2004-05-03
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by... NEC
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee wearing gloves. Performing routine maintenance of overland product conveyor. During maintenace employee lacerated his left thumb on sharp metal edge of angled steel of conveyor structure. Employee treated with first-aid products but approximately 4 days later thumb became infected.
|
|
Inspections
Start Date |
2024-05-31
|
End Date |
2024-05-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2023-09-15
|
End Date |
2023-09-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2022-05-19
|
End Date |
2022-05-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.75
|
|
Start Date |
2021-09-17
|
End Date |
2021-09-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2020-07-01
|
End Date |
2020-07-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2019-09-12
|
End Date |
2019-09-12
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
4.5
|
|
Start Date |
2018-08-24
|
End Date |
2018-08-24
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2018-08-16
|
End Date |
2018-08-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2017-06-27
|
End Date |
2017-06-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2016-04-27
|
End Date |
2016-04-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2015-08-04
|
End Date |
2015-08-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2011-07-27
|
End Date |
2011-07-27
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
20.5
|
|
Start Date |
2009-09-22
|
End Date |
2009-10-01
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
8.25
|
|
Start Date |
2009-07-20
|
End Date |
2009-07-23
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
20.5
|
|
Start Date |
2009-06-03
|
End Date |
2009-06-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23.5
|
|
Start Date |
2008-05-14
|
End Date |
2008-05-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
25
|
|
Start Date |
2007-06-26
|
End Date |
2007-06-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.25
|
|
Start Date |
2005-06-22
|
End Date |
2005-06-28
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
25.5
|
|
Start Date |
2005-01-13
|
End Date |
2005-01-13
|
Activity |
PART 50 AUDIT
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2004-06-01
|
End Date |
2004-06-22
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
33
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
4678
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
936
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
3704
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
529
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
5698
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
712
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
5418
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
903
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
6900
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
863
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
5618
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
936
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
5897
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1179
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
1608
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
146
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
8464
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
26
|
Avg. Employee Hours
|
326
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
6923
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1154
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
7321
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
813
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
1634
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
409
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
5431
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1358
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
18
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
18
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
2545
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
636
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
4669
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
467
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
2119
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
706
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
10470
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1309
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2005
|
Annual Hours
|
500
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
500
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2004
|
Annual Hours
|
17576
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
2929
|
|
|
#7-200 Portable Crusher
|
Surface
|
Abandoned
|
Construction Sand and Gravel
|
|
Directions to Mine |
Portable - currently mp 160 richardson
|
Parties
Name
|
QAP
|
Role
|
Operator
|
Start Date
|
2000-09-01
|
|
Name
|
Quality Asphalt Paving Inc
|
Role
|
Operator
|
Start Date
|
1985-05-01
|
End Date
|
2000-08-31
|
|
Name
|
Colas S A
|
Role
|
Current Controller
|
Start Date
|
2000-09-01
|
|
Name
|
QAP
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2014-07-08
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee was cleaning screen and smashed left index finger between parts of the screen and discharge lip. Screen size is 7' x 20'
|
|
Accident Date |
2005-05-12
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from machine
|
Ocupation |
Greaser, Grease man, Oiler, Lube man, Dragline oiler
|
Narrative |
Employee accessing top screen of double screen trailer to inspect screen condition. While using equipment guarding cover as steps in egress the employee's right foot slipped from 2-inch wide cover, resulting in his loss of balance and resulting 13-foot fall to grade.
|
|
Accident Date |
2002-08-01
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall from ladders
|
Ocupation |
Warehouseman, Bagger, Palletizer/Stacker, Store keeper, Packager, Fabricator, Cleaning plant operator
|
Narrative |
EMPLOYEE FILLING IMPACTOR'S HYDRAULIC OIL RESERVOIR. ACCESS TO RESERVOIR GAINED USING A LADDER. EMPLOYEE CLIMBING DOWN LADDER UPON COMPLETION OF TASK AT A FAST RATE. SLIPPED ON THE SECOND RUNG FROM THE BOTTOM. EMPLOYEE FELL FROM LADDER, LANDING ON HIS FEET. UPON LANDING HE TWISTED HIS RIGHT KNEE, TORN ACL & MANISCUSS.
|
|
Inspections
Start Date |
2014-08-30
|
End Date |
2014-08-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2011-08-30
|
End Date |
2011-08-30
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
.75
|
|
Start Date |
2010-06-02
|
End Date |
2010-06-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
24
|
|
Start Date |
2008-07-22
|
End Date |
2008-07-25
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
26.5
|
|
Start Date |
2005-04-21
|
End Date |
2005-04-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
28
|
|
Start Date |
2005-01-11
|
End Date |
2005-01-13
|
Activity |
PART 50 AUDIT
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2003-08-11
|
End Date |
2003-08-11
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2002-09-22
|
End Date |
2002-09-22
|
Activity |
ATTEMPTED INSPECTION
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2000-10-03
|
End Date |
2000-10-03
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
1874
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
469
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
2209
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
442
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
1952
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
325
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
1090
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
218
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
2044
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
681
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
3206
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
1069
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2013
|
Annual Hours
|
1603
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
401
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
3175
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
353
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
6370
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1274
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
2223
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
556
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
6872
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1145
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
6442
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1074
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
4632
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1158
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
5922
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1481
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2005
|
Annual Hours
|
600
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
600
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2004
|
Annual Hours
|
1344
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
336
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2003
|
Annual Hours
|
1400
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
350
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2002
|
Annual Hours
|
3360
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
560
|
|
|
Aggregate Products
|
Surface
|
Intermittent
|
Construction Sand and Gravel
|
|
Directions to Mine |
At intersection of C St. and 68th Avenue. Drive south on C St. from downtown Anchorage. Turn left onto 68th Avenue and then turn right on the next road to enter Company's yard.
|
Parties
Name
|
QAP
|
Role
|
Operator
|
Start Date
|
2002-04-01
|
|
Name
|
Aggregate Products Inc
|
Role
|
Operator
|
Start Date
|
1993-06-01
|
End Date
|
2002-03-31
|
|
Name
|
Colas S A
|
Role
|
Current Controller
|
Start Date
|
2002-04-01
|
|
Name
|
QAP
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2018-06-04
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck by flying object
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee was performing grinding welding operation and a foreign object got into an eye. Had it removed and prescribed drops and salve for eye. No work restriction.
|
|
Accident Date |
2017-08-07
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck against stationary object
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Miner was upset and punched the side of a train gravel car breaking right hand.
|
|
Accident Date |
2005-09-12
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee closing doors of rail cars delivering aggregate for later milling. Employee fell to grade after tripping on metal platform's raised edge. During fall pinching left, 1st finger between 6-foot long metal bar (used to lock door latch) and metal platform.
|
|
Accident Date |
2005-04-15
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Over-exertion NEC
|
Ocupation |
Front-end loader, Scraper-loader operator, Pan operator, Payloader, Scraper rig operator
|
Narrative |
CAT 980F loader control's adjustment jammed and operator unable to adjust for neutral positioning during equipment's operation. Several days of operation resulting in muscular repeatative motion injury to soft tissue, posterier of left shoulder. Injured employee tardy in prompt reporting to management.
|
|
Accident Date |
2004-09-20
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Maintenance man, Mechanic, Repair/Serviceman, Boilermaker, Fueler, Tire tech, Field service tech
|
Narrative |
Employee positioning railroad cross ties on the tines of a forklift. During movement of one tie his right middle finger tip was pinched between two ties. Employee suffered laceration requiring multipe sutchers and prescription medication.
|
|
Accident Date |
2004-09-08
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Fall to the walkway or working surface
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee closing bottom railcar doors. Closure requires employee to place 5 foot, 1 inch diameter steel bar in door hardware and using body leverage pull the door closed. During closure of a door the bar slipped from the hardware, resulting in the employee falling backwards to grade, landing on her left hip. Employee suffered severe contusion to her left hip area.
|
|
Accident Date |
2003-05-13
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Caught in, under or between NEC
|
Ocupation |
Miner, NEC
|
Narrative |
EE USING 6' LONG BAR TO UNLOCK AND OPEN RAILROAD CARS AGGREGATE MATERIAL. EE PLACED STEEL BAR IN DOORS LOCK TO OPEN DOOR. EE DID NOT IMMEDIATELY OPEN DOOR, BUT INSTEAD WALKED BACKWARDS WITH THE BACKING TRAIN. EE HAD HIS RIGHT HAND POSITIONED OVER THE FLAT END OF THE BAR. THE EE'S RIGHT HAND BECAME WEDGED BETWEEN THE STEEL BARS AND AN ADJACENT STEEL COLUMN.
|
|
Accident Date |
2003-05-10
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck by... NEC
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
EMPLOYEE PERFORMING MAINTENANCE ACTIVITIES FROM THE BACK OF A DOUBLE DOOR (SWINGING) VAN. ONE VAN DOOR WAS WIRED BACK TO THE VAN BODY TO SECURE IT IN PLACE. A STRONG WIND GUST PULLED THE DOOR AWAY FROM THE VAN. THE VAN DOOR SUDDENLY SWUNG, STRIKING THE EMPLOYEE IN THE RIGHT ELBOW.
|
|
Accident Date |
2002-09-05
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Caught in, under or between a moving and a stationary object
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
EMPLOYEE UNLOADING BARROW AGGREGATE FROM TRAIN CARS. TRAIN CAR DUMP DOORS BEING LODGED BY EMPLOYEE USING A STEEL BAR. EMPLOYEE KNOCKING THE DOOR'S LATCH DOWN BY STRIKING IT WITH THE STEEL BAR. WHILE STRIKING THE DOOR'S LATCH ON ONE CAR DOOR THE BAR SLIPPED, CAUSING THE EE'S LEFT HAND TO STRIKE A RAISED METAL EDGE ON THE TRAIN CAR. EE'S FINGER PINCHED BETWEEN THE STEEL BAR & TRAIN
|
|
Inspections
Start Date |
2024-07-14
|
End Date |
2024-07-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
33
|
|
Start Date |
2023-08-08
|
End Date |
2023-08-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.5
|
|
Start Date |
2023-05-17
|
End Date |
2023-05-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
1
|
|
Start Date |
2022-09-14
|
End Date |
2022-09-14
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2022-08-13
|
End Date |
2022-08-17
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.25
|
|
Start Date |
2021-05-24
|
End Date |
2021-06-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.25
|
|
Start Date |
2019-10-01
|
End Date |
2019-10-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.5
|
|
Start Date |
2019-07-01
|
End Date |
2019-07-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2018-08-01
|
End Date |
2018-08-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2017-07-05
|
End Date |
2017-07-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2016-06-29
|
End Date |
2016-07-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
22.25
|
|
Start Date |
2015-04-27
|
End Date |
2015-05-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
2
|
Total Hours |
13.5
|
|
Start Date |
2014-05-06
|
End Date |
2014-05-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2013-10-10
|
End Date |
2013-10-11
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
5
|
|
Start Date |
2013-10-10
|
End Date |
2013-10-10
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
3.5
|
|
Start Date |
2013-07-17
|
End Date |
2013-07-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2012-06-01
|
End Date |
2012-06-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12
|
|
Start Date |
2011-07-29
|
End Date |
2011-08-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
13.25
|
|
Start Date |
2009-09-17
|
End Date |
2009-10-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.75
|
|
Start Date |
2008-10-07
|
End Date |
2008-10-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
15599
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
1300
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
17237
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
1436
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
18302
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
1220
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
9432
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1179
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
9854
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1232
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
23577
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
1572
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
22888
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
19
|
Avg. Employee Hours
|
1205
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
24753
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
26
|
Avg. Employee Hours
|
952
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
7671
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
26
|
Avg. Employee Hours
|
295
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
9138
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
703
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
9497
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
1187
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
11311
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
870
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
14803
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
1057
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
19135
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
1472
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
4541
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
2271
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
19476
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
1391
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
6057
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
2019
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
10634
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
1063
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
2839
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1420
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
14759
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
1342
|
|
|
#7-300 Crusher C Portable
|
Surface
|
Intermittent
|
Crushed, Broken Stone NEC
|
|
Directions to Mine |
Mobile - various locations.
|
Parties
Name
|
QAP
|
Role
|
Operator
|
Start Date
|
2000-09-01
|
|
Name
|
Quality Asphalt Paving Inc
|
Role
|
Operator
|
Start Date
|
1998-09-01
|
End Date
|
2000-08-31
|
|
Name
|
Colas S A
|
Role
|
Current Controller
|
Start Date
|
2000-09-01
|
|
Name
|
QAP
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2005-09-05
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Over-exertion in pulling or pushing objects
|
Ocupation |
Outside foreman, Leadman
|
Narrative |
Employee changing metal screen section from aggregate screening trailer. While pulling metal screen (6'x8' @ 60 lbs) employee sufferred muscle tissue pain in right forearm.
|
|
Accident Date |
2004-08-09
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck against stationary object
|
Ocupation |
Laborer, Blacksmith, Bull gang, Parts runner, Roustabout, Pick-up man, Pitman
|
Narrative |
Employee descending fabricated steel ladder to grade. As employee stepped from the last rung of the ladder with his left foot he stepped upon a rock on grade at the ladder's base. Employee mildly strained his left knee.
|
|
Accident Date |
2004-06-11
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Contact with hot objects or substances
|
Ocupation |
Welder (shop)
|
Narrative |
Employee inside impactor cutting bolts with an acetylene/oxygen torch. Employee lit and used torch without event when suddently the torch flared. Employee either: 1. pinched the gas lines and then un-pinched the lines which resulted in a gas surge, or 2. accidently opened the acetylene valve on the torch. Employee burned - 2nd degree - on left side of his face.
|
|
Accident Date |
2003-10-05
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
No Value Found
|
Ocupation |
NO VALUE FOUND
|
Narrative |
EMPLOYEE IS A GROUNDMAN ON A PORTABLE CRUSHER. DUE TO SPILLAGE OF PROCESSED AGGREGATE FROM EQUIPMENT AND CONVEYORS, HE HAD TO ACTIVELY PERFORM SHOVELING AS PART OF HIS SHIFT DUTIES. DUE TO FR EQUENT SHOVELING HE SUFFERED A PINCHED NERVE IN HIS NECK WHICH REQUIRED CHIROPRACTIC TREATMENT.
|
|
Accident Date |
2003-04-07
|
Degree Inhury |
DAYS AWAY FROM WORK ONLY
|
Accident Type |
Struck against stationary object
|
Ocupation |
Backhoe operator, Trackhoe operator, Crane operator
|
Narrative |
EE PERFORMING MAINTENANCE ON NON-OPERATING FEED HOPPER/ JAW CRUSHER. ACCESS TO WORK AREA RESTRICTED REQUIRING EE TO STOOP AND CRAWL. UPON ENTERING THE WORK AREA THE EE STOOD UP, STRIKING ONE O F THE 4 BY 4 HORIZONTAL TUBE STEEL SUPPORTS OFTHE FEED HOPPERS WINGS. EE WAS WEARING A HARD HAT AND SAFETY GLASSES. EE SUFFERED ABRASIONS AND CONTUSIONS TO HIS FACE, AND LACERATION R EYE.
|
|
Inspections
Start Date |
2024-06-19
|
End Date |
2024-06-20
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2023-07-21
|
End Date |
2023-07-21
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2022-08-02
|
End Date |
2022-08-02
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2021-07-01
|
End Date |
2021-07-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.5
|
|
Start Date |
2017-07-26
|
End Date |
2017-07-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
2.5
|
|
Start Date |
2016-08-23
|
End Date |
2016-08-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.25
|
|
Start Date |
2015-06-25
|
End Date |
2015-06-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
32.5
|
|
Start Date |
2014-05-06
|
End Date |
2014-05-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14
|
|
Start Date |
2013-07-17
|
End Date |
2013-07-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.25
|
|
Start Date |
2012-06-02
|
End Date |
2012-06-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2011-07-29
|
End Date |
2011-08-02
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
14.75
|
|
Start Date |
2009-09-16
|
End Date |
2009-10-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.25
|
|
Start Date |
2008-10-07
|
End Date |
2008-10-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2008-08-13
|
End Date |
2008-08-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.25
|
|
Start Date |
2005-01-12
|
End Date |
2005-01-13
|
Activity |
PART 50 AUDIT
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2004-10-21
|
End Date |
2004-10-26
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
57
|
|
Start Date |
2003-10-10
|
End Date |
2003-10-14
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
17
|
|
Start Date |
2002-10-15
|
End Date |
2002-10-15
|
Activity |
SPECIAL ENFORCEMENT 4
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2002-10-10
|
End Date |
2002-10-10
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
17
|
|
Start Date |
2002-05-29
|
End Date |
2002-05-29
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
16
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
1349
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
450
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
4495
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
749
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
1026
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
257
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
11509
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
21
|
Avg. Employee Hours
|
548
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
3855
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
13
|
Avg. Employee Hours
|
297
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
71
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
24
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
3289
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
365
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
4346
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
310
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
5298
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1060
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
5360
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
893
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
5164
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1291
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
4797
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
800
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
8726
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1745
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
9331
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1555
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
8
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
8
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
8485
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1414
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
7047
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1762
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
5060
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
422
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
6330
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
1266
|
|
|
#7-500 Portable Crusher
|
Surface
|
Abandoned
|
Construction Sand and Gravel
|
|
Directions to Mine |
portable
|
Parties
Name
|
H & H Contractors Inc
|
Role
|
Operator
|
Start Date
|
2001-05-01
|
End Date
|
2006-03-30
|
|
Name
|
QAP
|
Role
|
Operator
|
Start Date
|
2006-03-31
|
|
Name
|
Colas S A
|
Role
|
Current Controller
|
Start Date
|
2006-03-31
|
|
Name
|
QAP
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2017-06-21
|
End Date |
2017-06-21
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2016-07-08
|
End Date |
2016-07-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.75
|
|
Start Date |
2015-09-01
|
End Date |
2015-09-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
32.25
|
|
Start Date |
2014-07-15
|
End Date |
2014-07-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17
|
|
Start Date |
2009-06-26
|
End Date |
2009-06-27
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2008-06-05
|
End Date |
2008-06-08
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9.25
|
|
Start Date |
2007-08-14
|
End Date |
2007-08-14
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
4
|
|
Start Date |
2005-07-30
|
End Date |
2005-07-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2004-08-09
|
End Date |
2004-08-10
|
Activity |
PART 50 AUDIT
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2004-07-21
|
End Date |
2004-07-21
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2003-08-08
|
End Date |
2003-08-08
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
1
|
Total Hours |
8
|
|
Start Date |
2003-07-31
|
End Date |
2003-07-31
|
Activity |
ATTEMPTED INSPECTION
|
Number Inspectors |
2
|
Total Hours |
6
|
|
Start Date |
2002-06-26
|
End Date |
2002-06-26
|
Activity |
REGULAR INSPECTION
|
Number Inspectors |
2
|
Total Hours |
11
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
6599
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
14
|
Avg. Employee Hours
|
471
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
2392
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
159
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
7486
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
11
|
Avg. Employee Hours
|
681
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
4101
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1025
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
5976
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1494
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
227
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
76
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
1308
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
327
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
10
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
10
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
1695
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
141
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
2
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
1058
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
71
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
333
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
83
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2003
|
Annual Hours
|
792
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
396
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2002
|
Annual Hours
|
1122
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
561
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2001
|
Annual Hours
|
981
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
327
|
|
|
Wash Plant Primary
|
Surface
|
Intermittent
|
Construction Sand and Gravel
|
|
Directions to Mine |
Kashwitna Pit - Mile 87 of Parks Hwy.
|
Parties
Name
|
H & H Contractors Inc
|
Role
|
Operator
|
Start Date
|
2001-05-01
|
End Date
|
2006-03-30
|
|
Name
|
QAP
|
Role
|
Operator
|
Start Date
|
2006-03-31
|
|
Name
|
Colas S A
|
Role
|
Current Controller
|
Start Date
|
2006-03-31
|
|
Name
|
QAP
|
Role
|
Current Operator
|
|
Accidents
Accident Date |
2021-10-02
|
Degree Inhury |
DAYS RESTRICTED ACTIVITY ONLY
|
Accident Type |
Struck against a moving object
|
Ocupation |
Outside foreman, Leadman
|
Narrative |
Employee drove D-10 Dozer over an embankment and dozer fell on its right side. Employee cut right elbow and punctured right shoulder. Both required stitches
|
|
Accident Date |
2019-08-05
|
Degree Inhury |
NO DYS AWY FRM WRK,NO RSTR ACT
|
Accident Type |
Struck against a moving object
|
Ocupation |
Bulldozer operator, Universal operator, Heavy equipment operator, Operating engineer
|
Narrative |
Miner was feeding the plant from a high wall with a 988 loader. Face of wall came down into bucket causing miner to hit the ceiling of the loader.
|
|
Inspections
Start Date |
2024-05-30
|
End Date |
2024-05-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7
|
|
Start Date |
2023-07-13
|
End Date |
2023-07-13
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2023-05-17
|
End Date |
2023-05-17
|
Activity |
Special Emphasis Programs
|
Number Inspectors |
1
|
Total Hours |
2.75
|
|
Start Date |
2023-04-13
|
End Date |
2023-04-13
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
2
|
|
Start Date |
2022-09-23
|
End Date |
2022-09-23
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
6.75
|
|
Start Date |
2022-09-02
|
End Date |
2022-09-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2021-10-12
|
End Date |
2021-10-13
|
Activity |
Verbal Hazard Complaint Inspections
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2021-04-27
|
End Date |
2021-04-27
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
9.5
|
|
Start Date |
2020-10-15
|
End Date |
2020-10-16
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2020-10-06
|
End Date |
2020-10-07
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19
|
|
Start Date |
2020-05-15
|
End Date |
2020-05-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
27.25
|
|
Start Date |
2019-09-17
|
End Date |
2019-09-18
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
16.75
|
|
Start Date |
2019-07-11
|
End Date |
2019-07-11
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.75
|
|
Start Date |
2018-07-19
|
End Date |
2018-07-20
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.75
|
|
Start Date |
2016-10-03
|
End Date |
2016-10-03
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.25
|
|
Start Date |
2016-06-29
|
End Date |
2016-06-29
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2016-06-08
|
End Date |
2016-06-08
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
6.75
|
|
Start Date |
2016-06-03
|
End Date |
2016-06-10
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.75
|
|
Start Date |
2015-09-29
|
End Date |
2015-09-29
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
16
|
|
Start Date |
2015-07-02
|
End Date |
2015-07-31
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
29
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
6819
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1705
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
6010
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1002
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2022
|
Annual Hours
|
6842
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
977
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
4573
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
762
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
4854
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
809
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
11356
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
1622
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
10083
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
6
|
Avg. Employee Hours
|
1681
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
15798
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
16
|
Avg. Employee Hours
|
987
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
3495
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
388
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
4861
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
694
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
2392
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
797
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
1814
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
605
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
3688
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
410
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
20
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
20
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
6135
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
10
|
Avg. Employee Hours
|
614
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
10
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
10
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
4042
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
12
|
Avg. Employee Hours
|
337
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
10
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
10
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
998
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
15
|
Avg. Employee Hours
|
67
|
|
|
Cange Pit
|
Surface
|
Abandoned
|
Construction Sand and Gravel
|
|
Directions to Mine |
From Anchorage. Drive north on Glenn Highway. Turn left on the Parks Highway at the Glenn/Parks Highway intersection. Drive north on the Parks Highway thru Wasilla to MP 52 of the Parks Highway. Turn right on Pindale Road, crossing ARRC crossing, and turning right into mine at second access road.
|
Parties
Name
|
QAP
|
Role
|
Operator
|
Start Date
|
2003-11-13
|
|
Name
|
Colas S A
|
Role
|
Current Controller
|
Start Date
|
2003-11-13
|
|
Name
|
QAP
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2016-09-30
|
End Date |
2016-10-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15
|
|
Start Date |
2016-04-27
|
End Date |
2016-04-29
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
19.5
|
|
Start Date |
2015-08-04
|
End Date |
2015-08-04
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2015-07-18
|
End Date |
2015-07-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Start Date |
2012-10-04
|
End Date |
2012-10-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
25.5
|
|
Start Date |
2011-09-09
|
End Date |
2011-10-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.5
|
|
Start Date |
2011-04-29
|
End Date |
2011-04-29
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
3.75
|
|
Start Date |
2010-10-25
|
End Date |
2010-11-01
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
15.75
|
|
Start Date |
2010-09-29
|
End Date |
2010-10-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
30
|
|
Start Date |
2009-09-24
|
End Date |
2009-10-01
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
7.75
|
|
Start Date |
2008-10-03
|
End Date |
2008-10-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6.5
|
|
Start Date |
2008-05-21
|
End Date |
2008-05-24
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
17.5
|
|
Start Date |
2006-10-03
|
End Date |
2006-10-05
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
18
|
|
Start Date |
2005-06-13
|
End Date |
2005-06-15
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
31
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2024
|
Annual Hours
|
0
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
0
|
Avg. Employee Hours
|
0
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2018
|
Annual Hours
|
142
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
71
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
2480
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
310
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
2225
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
278
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
5902
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
1476
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
16158
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2308
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2011
|
Annual Hours
|
2123
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
2123
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
14390
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
2056
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2010
|
Annual Hours
|
1987
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1987
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
10564
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2113
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2009
|
Annual Hours
|
1995
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
1995
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
11256
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
2251
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2008
|
Annual Hours
|
2268
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1134
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
10613
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
17
|
Avg. Employee Hours
|
624
|
|
Sub-Unit Desc
|
OFFICE WORKERS AT MINE SITE
|
Year
|
2007
|
Annual Hours
|
228
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
114
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2006
|
Annual Hours
|
22885
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
8
|
Avg. Employee Hours
|
2861
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2005
|
Annual Hours
|
22880
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
2542
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2004
|
Annual Hours
|
8634
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
2159
|
|
|
#7-400 Portable Crusher
|
Surface
|
Intermittent
|
Construction Sand and Gravel
|
|
Directions to Mine |
Portable, currently near Healy.
|
Parties
Name
|
QAP
|
Role
|
Operator
|
Start Date
|
2007-06-12
|
|
Name
|
Colas S A
|
Role
|
Current Controller
|
Start Date
|
2007-06-12
|
|
Name
|
QAP
|
Role
|
Current Operator
|
|
Inspections
Start Date |
2024-08-11
|
End Date |
2024-08-11
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
3
|
|
Start Date |
2023-05-23
|
End Date |
2023-05-23
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
5.5
|
|
Start Date |
2021-06-30
|
End Date |
2021-06-30
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
9
|
|
Start Date |
2019-10-09
|
End Date |
2019-10-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
3.25
|
|
Start Date |
2017-06-16
|
End Date |
2017-06-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
6
|
|
Start Date |
2016-08-15
|
End Date |
2016-08-18
|
Activity |
Mine Idle Activity
|
Number Inspectors |
1
|
Total Hours |
23
|
|
Start Date |
2016-08-02
|
End Date |
2016-08-04
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
12.5
|
|
Start Date |
2015-08-25
|
End Date |
2015-08-25
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
11
|
|
Start Date |
2015-08-04
|
End Date |
2015-08-04
|
Activity |
Compliance Follow-up Inspection
|
Number Inspectors |
1
|
Total Hours |
1.5
|
|
Start Date |
2015-07-30
|
End Date |
2015-07-30
|
Activity |
Spot Inspection
|
Number Inspectors |
1
|
Total Hours |
10
|
|
Start Date |
2015-06-10
|
End Date |
2015-06-16
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
57.75
|
|
Start Date |
2011-09-07
|
End Date |
2011-09-09
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
10.75
|
|
Start Date |
2010-06-17
|
End Date |
2010-06-18
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
15.5
|
|
Start Date |
2008-10-03
|
End Date |
2008-10-06
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
8.25
|
|
Start Date |
2008-06-19
|
End Date |
2008-06-19
|
Activity |
Regular Safety and Health Inspection
|
Number Inspectors |
1
|
Total Hours |
11.75
|
|
Productions
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2024
|
Annual Hours
|
2529
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
2
|
Avg. Employee Hours
|
1265
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2023
|
Annual Hours
|
4711
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
523
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2021
|
Annual Hours
|
3671
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
9
|
Avg. Employee Hours
|
408
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2020
|
Annual Hours
|
3471
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
868
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2019
|
Annual Hours
|
1535
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
5
|
Avg. Employee Hours
|
307
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2017
|
Annual Hours
|
2708
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
387
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2016
|
Annual Hours
|
1105
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
7
|
Avg. Employee Hours
|
158
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2015
|
Annual Hours
|
1967
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
492
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2014
|
Annual Hours
|
77
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
1
|
Avg. Employee Hours
|
77
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2013
|
Annual Hours
|
3949
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
987
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2012
|
Annual Hours
|
2234
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
3
|
Avg. Employee Hours
|
745
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2011
|
Annual Hours
|
638
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
160
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2010
|
Annual Hours
|
1833
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
458
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2009
|
Annual Hours
|
1370
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
343
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2008
|
Annual Hours
|
3208
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
4
|
Avg. Employee Hours
|
802
|
|
Sub-Unit Desc
|
STRIP, QUARY, OPEN PIT
|
Year
|
2007
|
Annual Hours
|
3325
|
Annual Coal Prod
|
0
|
Avg. Annual Empl.
|
35
|
Avg. Employee Hours
|
95
|
|
|